NOTICE TO MEMBERS OF WASHINGTON ELECTRIC COOPERATIVE, INC. OF FILING OF
PROPOSED INTEGRATED RESOURCE PLAN
Washington Electric Cooperative, Inc. has submitted its 2024 Integrated Resource Plan (IRP) to the Vermont Public Utility Commission (PUC) for review. The IRP represents WEC’s plan for meeting the public’s need for energy services safely, reliably, and at the lowest cost possible. The plan includes an analysis of WEC’s energy needs and supply resources, its planned distribution system improvements, vegetation management, and potential environmental impacts. WEC’s IRP can be accessed through its website: www.washingtonelectric.coop or through the PUC’s electronic filing system (“ePUC”) at http://epuc.vermont.gov/. Search by Case Number 24-1106-PET. Customers wishing to comment on WEC’s IRP, intervene in this proceeding, or request that the PUC hold a public hearing may do so by making a filing in this case in ePUC or contacting the PUC at: puc.clerk@vermont.gov or 112 State Street, Montpelier, VT 05620-2701, or (802) 828-2358 by June 26th, 2024. Please reference Case Number 24-1106-PET.
Rate & Tariff Announcements
- 2022 Rate Increase Notice Filed with the Public Utility Commission, September 15, 2022 (PDF)
- 2020 Rate Increase Notice filed with Public Utility Commission November 15, 2019 (PDF)
- 2020 Rate Increase Notice for Policy No. 82 Pole Attachments (PDF) filed with Public Utilities Commission on July 30, 2020 (reference ePUC case No 20-2046-TF)
Net Metering
- Notice to Members of Washington Electric
Cooperative, Inc. of Net-Metering Tariff Change Affecting Directly-Interconnected Group Net Metering Systems (PDF) - 2021 - June 15 Net Metering Ruling Public Hearing (PDF)
Public Utility Commission Notices & Filings
- 2024 IRP Filing (PDF)
- 2024 IRP Appendices A-K
- 2024 IRP Appendices L-P can be requested from WEC at info@wec.coop or 802-223-5245
- 2021 PUC Order of Notice 21-1816-PET (PDF)